|
1
|
- by
- Alan A. Smith
- Alan A. Smith Inc.
- Dundas, Ontario, Canada
- Return to Main Site
|
|
2
|
- Confirm that program is authorized
- Accept statement of Disclaimer
- Select system of units
- Define an Output file
- Set the time parameters
|
|
3
|
- Metric/SI or Imperial
- Units are all kinematic (no force or mass)
mm/hr, metre/sec, cub.m, hectare-m
or
inch/hr, feet/sec, cub.m, acre-feet
- Units cannot be changed after time parameters have been defined
|
|
4
|
- Contains a record of all commands, data and results to allow design
session to be repeated exactly
- Can be converted to an Input database to run in Automatic mode
- Should be stored in special folder for each job
|
|
5
|
- Time step for hydrology
- Maximum expected storm duration
- Maximum expected hydrograph length
|
|
6
|
- Show or hide status bar
- Include full path in Output file
- Review Output file at any time
- Use context sensitive help
- Show or hide ‘tool-tips’
- Select from ‘Other Options’
|